{"id":24253,"date":"2020-07-13T13:59:29","date_gmt":"2020-07-13T13:59:29","guid":{"rendered":"http:\/\/watchdogplusmedia.com\/?p=24253"},"modified":"2020-07-13T13:59:36","modified_gmt":"2020-07-13T13:59:36","slug":"nigeria-china-to-broker-n43-24bn-construction-deal-for-ibadan-port","status":"publish","type":"post","link":"https:\/\/watchdogplusmedia.com\/?p=24253","title":{"rendered":"Nigeria, China to broker N43.24bn construction deal for Ibadan Port"},"content":{"rendered":"\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/i3.wp.com\/www.ripplesnigeria.com\/wp-content\/uploads\/2020\/07\/Dry-Port-in-Ibadan.jpg\" alt=\"Nigeria, China to broker N43.24bn construction deal for Ibadan Port\"\/><\/figure>\n\n\n\n<p>The bargain process between Nigeria and China Railway Construction Corporation Limited (CRCC) regarding the construction of the Ibadan Inland Dry Port is almost consummated, the Nigerian Shippers\u2019 Council (NSC) said Sunday.<\/p>\n\n\n\n<p>The 80,000 TEU capacity dry port has the NSC as the guarantor of its concession while the&nbsp;<a href=\"https:\/\/www.ripplesnigeria.com\/how-report-on-nigeria-railway-contract-forced-ghana-to-end-mou-with-crcc-nigeria\/\">CRCC<\/a>&nbsp;has emerged as the preferred bidder of the project, which will be executed via a public-private partnership agreement.<\/p>\n\n\n\n<p>Rakiya Zubairu, spokesperson of the NSC, declared in a statement in Abuja that the port, when delivered, would offer answer to the issues of perennial port gridlock and the traffic jam in Apapa Lagos.<\/p>\n\n\n\n<p>The council stated that the port infrastructure would handle cargos for import and export purposes while positioning south-west Nigeria as its target market.<\/p>\n\n\n\n<p>\u201cAmong other uses, the dry port will provide a competitive cargo sorting centre, bulk breaking as well as cargo-tracking and truck management services.<\/p>\n\n\n\n<p>\u201cThe Lagos-Kano standard gauge railway currently under construction is aligned to the proposed dry port, making it easy to convey cargo from the seaports in Lagos and to all destinations along the route,\u201d Ms Zubairu said.<\/p>\n\n\n\n<p>The construction is projected to adopt local content substantially at every phase of development and operation with the expectation to stimulate employment generation in&nbsp;<a href=\"https:\/\/www.ripplesnigeria.com\/oyo-pdp-denies-makinde-is-at-war-with-federal-government\/\">Oyo State<\/a>&nbsp;and neighbouring cities.<\/p>\n\n\n\n<p>\u201cHaving concluded this stage, an updated full business case compliance report will be produced. A draft agreement will be presented to the Federal Ministry of Justice and sent to the Infrastructure Concession Regulatory Commission for vetting.<\/p>\n\n\n\n<p>\u201cAfter that, the Minister of Transportation will present the agreement to the Federal Executive Council. The concessionaire will then be taken to the site for sod-turning. It is expected that construction will commence immediately after the ceremony. The timeline for completion is 12 months,\u201d she said.<\/p>\n\n\n\n<p>The deal was midwifed by the Federal Ministry of Transportation with its Permanent Secretary and Director of Maritime Services, Auwalu Suleiman at the forefront of negotiations.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The bargain process between Nigeria and China Railway Construction Corporation Limited (CRCC) regarding the construction of the Ibadan Inland Dry Port is almost consummated, the Nigerian Shippers\u2019 Council (NSC) said Sunday. The 80,000 TEU capacity dry port has the NSC as the guarantor of its concession while the&nbsp;CRCC&nbsp;has emerged as the preferred bidder of the [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_mi_skip_tracking":false},"categories":[4],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Nigeria, China to broker N43.24bn construction deal for Ibadan Port &raquo; WatchDog Plus Media<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/watchdogplusmedia.com\/?p=24253\" \/>\n<meta name=\"author\" content=\"Odofin\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/watchdogplusmedia.com\/?p=24253#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/watchdogplusmedia.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Business\",\"item\":\"https:\/\/watchdogplusmedia.com\/?cat=4\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Nigeria, China to broker N43.24bn construction deal for Ibadan Port\"}]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Nigeria, China to broker N43.24bn construction deal for Ibadan Port &raquo; WatchDog Plus Media","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/watchdogplusmedia.com\/?p=24253","author":"Odofin","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BreadcrumbList","@id":"https:\/\/watchdogplusmedia.com\/?p=24253#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/watchdogplusmedia.com\/"},{"@type":"ListItem","position":2,"name":"Business","item":"https:\/\/watchdogplusmedia.com\/?cat=4"},{"@type":"ListItem","position":3,"name":"Nigeria, China to broker N43.24bn construction deal for Ibadan Port"}]}]}},"rttpg_featured_image_url":null,"rttpg_author":{"display_name":"Odofin","author_link":"https:\/\/watchdogplusmedia.com\/?author=2"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/watchdogplusmedia.com\/?cat=4\" rel=\"category\">Business<\/a>","rttpg_excerpt":"The bargain process between Nigeria and China Railway Construction Corporation Limited (CRCC) regarding the construction of the Ibadan Inland Dry Port is almost consummated, the Nigerian Shippers\u2019 Council (NSC) said Sunday. The 80,000 TEU capacity dry port has the NSC as the guarantor of its concession while the&nbsp;CRCC&nbsp;has emerged as the preferred bidder of the&hellip;","_links":{"self":[{"href":"https:\/\/watchdogplusmedia.com\/index.php?rest_route=\/wp\/v2\/posts\/24253"}],"collection":[{"href":"https:\/\/watchdogplusmedia.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/watchdogplusmedia.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/watchdogplusmedia.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/watchdogplusmedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=24253"}],"version-history":[{"count":-4,"href":"https:\/\/watchdogplusmedia.com\/index.php?rest_route=\/wp\/v2\/posts\/24253\/revisions"}],"wp:attachment":[{"href":"https:\/\/watchdogplusmedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=24253"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/watchdogplusmedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=24253"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/watchdogplusmedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=24253"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}