{"id":24799,"date":"2020-07-17T13:47:30","date_gmt":"2020-07-17T13:47:30","guid":{"rendered":"http:\/\/watchdogplusmedia.com\/?p=24799"},"modified":"2020-07-17T13:47:39","modified_gmt":"2020-07-17T13:47:39","slug":"2074-megawatts-remain-untapped-as-one-third-of-nigerias-power-plants-shut-down","status":"publish","type":"post","link":"https:\/\/watchdogplusmedia.com\/?p=24799","title":{"rendered":"2,074 megawatts remain untapped as one-third of Nigeria\u2019s power plants shut down"},"content":{"rendered":"\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/i3.wp.com\/www.ripplesnigeria.com\/wp-content\/uploads\/2018\/12\/Electricity-power-plant.jpg\" alt=\"Transcorp Power Consortium beats two others to win Afam Power Plc bid\"\/><\/figure>\n\n\n\n<p>Nine or one-third of Nigeria\u2019s 27 power plants were idle on Thursday, making 2,079.1 megawatts (mw) out of the nation\u2019s total generation capacity remain idle.<\/p>\n\n\n\n<p>Total power generation climbed to 3,269mw as of 6 am Thursday, according to data from the Nigerian Electricity System Operator\u2019s website, up from 3,074.6mw a day before.<\/p>\n\n\n\n<p>The country\u2019s installed generation capacity is 12,910.40mw, available capacity 7,652.60mw, transmission wheeling capacity 8,100mw and all-time peak generation 5,375mw<\/p>\n\n\n\n<p>Five of the power plants were among those constructed under the National Integrated Power Project including namely Gbarain, Ihovbor, Olorunsogo II, Omotosho II and Alaoji. AES, Afam IV &amp; V, Ibom Power and ASCO made up the rest.<\/p>\n\n\n\n<p>The system operator cited low load demand by the distribution companies, maintenance, gas inadequacy, frequency response and gas pipeline rupturing among other reasons for the shutdown.<\/p>\n\n\n\n<p>One of the plants, AES, has not produced power since September 2014.<\/p>\n\n\n\n<p>Nigeria derives the&nbsp;<a href=\"https:\/\/www.get-invest.eu\/market-information\/nigeria\/energy-sector\/#:~:text=Nigeria%20has%2012%2C500%20MW%20of,12.5%25%20and%2087.5%25%20respectively.\" target=\"_blank\" rel=\"noreferrer noopener\">87.5 per cent<\/a>&nbsp;of its electricity from gas-fired power plants, with the rest 12.5 per cent coming from hydro sources.<\/p>\n\n\n\n<p>The Advisory Power Team, Office of the Vice-President said on Wednesday, \u201cthe power sector lost an estimated N2.01bn on July 14, 2020 due to constraints from insufficient gas supply, distribution infrastructure and transmission infrastructure.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nine or one-third of Nigeria\u2019s 27 power plants were idle on Thursday, making 2,079.1 megawatts (mw) out of the nation\u2019s total generation capacity remain idle. Total power generation climbed to 3,269mw as of 6 am Thursday, according to data from the Nigerian Electricity System Operator\u2019s website, up from 3,074.6mw a day before. The country\u2019s installed [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_seopress_robots_primary_cat":"none","_mi_skip_tracking":false},"categories":[25],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v20.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>2,074 megawatts remain untapped as one-third of Nigeria\u2019s power plants shut down &raquo; WatchDog Plus Media<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/watchdogplusmedia.com\/?p=24799\" \/>\n<meta name=\"author\" content=\"Odofin\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/watchdogplusmedia.com\/?p=24799#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/watchdogplusmedia.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Electricity\",\"item\":\"https:\/\/watchdogplusmedia.com\/?cat=25\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"2,074 megawatts remain untapped as one-third of Nigeria\u2019s power plants shut down\"}]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"2,074 megawatts remain untapped as one-third of Nigeria\u2019s power plants shut down &raquo; WatchDog Plus Media","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/watchdogplusmedia.com\/?p=24799","author":"Odofin","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BreadcrumbList","@id":"https:\/\/watchdogplusmedia.com\/?p=24799#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/watchdogplusmedia.com\/"},{"@type":"ListItem","position":2,"name":"Electricity","item":"https:\/\/watchdogplusmedia.com\/?cat=25"},{"@type":"ListItem","position":3,"name":"2,074 megawatts remain untapped as one-third of Nigeria\u2019s power plants shut down"}]}]}},"rttpg_featured_image_url":null,"rttpg_author":{"display_name":"Odofin","author_link":"https:\/\/watchdogplusmedia.com\/?author=2"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/watchdogplusmedia.com\/?cat=25\" rel=\"category\">Electricity<\/a>","rttpg_excerpt":"Nine or one-third of Nigeria\u2019s 27 power plants were idle on Thursday, making 2,079.1 megawatts (mw) out of the nation\u2019s total generation capacity remain idle. Total power generation climbed to 3,269mw as of 6 am Thursday, according to data from the Nigerian Electricity System Operator\u2019s website, up from 3,074.6mw a day before. The country\u2019s installed&hellip;","_links":{"self":[{"href":"https:\/\/watchdogplusmedia.com\/index.php?rest_route=\/wp\/v2\/posts\/24799"}],"collection":[{"href":"https:\/\/watchdogplusmedia.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/watchdogplusmedia.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/watchdogplusmedia.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/watchdogplusmedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=24799"}],"version-history":[{"count":-4,"href":"https:\/\/watchdogplusmedia.com\/index.php?rest_route=\/wp\/v2\/posts\/24799\/revisions"}],"wp:attachment":[{"href":"https:\/\/watchdogplusmedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=24799"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/watchdogplusmedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=24799"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/watchdogplusmedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=24799"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}